Solving grid congestion: 7 options for your business
On the waiting list for a bigger grid connection? Seven options for a business facing grid congestion, and a worked example: a 40 kW expansion that goes over the limit in only 1.1% of the year.
Explanations and worked examples on quarter-hour data, for installers and consultants.
On the waiting list for a bigger grid connection? Seven options for a business facing grid congestion, and a worked example: a 40 kW expansion that goes over the limit in only 1.1% of the year.
What negative power prices, curtailing and the export limit do to solar panels on a large Dutch grid connection, calculated on 2025 quarter-hour data.
With a simultaneity factor, an office on 160 kW gets 2 to 14 charge points. Calculated per quarter hour, 4 fit, or 39 with smart charging. Here is how.
Dutch net metering ends on 1 January 2027 for connections up to and including 3x80A, businesses included. What changes, what it costs and what to do about it.
How big should a business battery for peak shaving be? Calculate kW and kWh from quarter-hour data, with a worked example for a metalworking company.
An energy simulation calculates per quarter hour whether a battery, solar panels or chargers fit within your grid connection. With a worked example.