How many EV chargers fit on my grid connection?
With a simultaneity factor, an office on 160 kW gets 2 to 14 charge points. Calculated per quarter hour, 4 fit, or 39 with smart charging. Here is how.
How many chargers fit on a connection depends on the headroom left under the transport capacity each quarter hour, and on when the cars arrive and leave. With a simultaneity factor, an office with a warehouse on 160 kW gets anywhere from 2 to 14 charge points. Calculated per quarter hour, 4 fit without smart charging and 39 with it.
What a simultaneity factor is
A charger often has two charge points; this article counts charge points, with one car per point. A simultaneity factor, also called a diversity factor, says what share of the charge points is in use at the same time. Add up the power of all charge points and multiply by the factor, and you have an estimate of the combined charging load. If that fits in the headroom that current consumption leaves under the transport capacity (the power the grid operator allows per quarter hour), the charge points fit.
Which factor you take depends on where you look:
- 1, according to the Dutch installation standard NEN 1010 for the circuits to the charge points: all charge points can be used at the same time, so you calculate as if they are, unless charging is controlled1. For the connection, that is the most cautious choice.
- 0.8 in the busiest quarter hour of the worked example below, with 10 charge points: 8 of them charge at once.
- 0.17 on average in the same example: a car charges in 6 of the 35 quarter hours it is parked.
As long as the connection had headroom to spare, it made little difference which factor you chose: a charge point too many or too few was lost in the margin. Where the connection can no longer be upgraded, that margin is gone and every quarter hour counts.
Why one factor does not give the answer
A factor estimates the combined charging load. The question is whether that fits in the headroom left under the transport capacity at that moment. Both change every quarter hour.
- The headroom is not a fixed number. A business's consumption peaks for a few hours a day. The transport capacity minus the year's highest peak is the headroom in the tightest quarter hour. A calculation with that number treats the whole day as if it had no more headroom than that.
- Simultaneity depends on when cars arrive. Employees come in over a couple of hours and plug in straight away. Then most of them charge at once, even if over the whole day they only charge a small part of the time.
An average simultaneity is like the average number of cars on the motorway over a whole day. It is correct, and it says nothing about the traffic jam at half past eight.
Worked example: an office with a warehouse on 160 kW
A wholesaler has an office and a warehouse on one large connection with 160 kW of contracted transport capacity. The warehouse runs on working days from 6:00 to 16:00, the office from 8:00 to 17:30. In winter a heat pump heats the building; on warm summer days the air conditioning cools it. The business uses 459 MWh a year, 52 kW on average. The highest quarter hour is 132 kW, on Wednesday 26 February at 9:45.
The business is fictional. Its quarter-hour profile was built for this article and covers all of 2025, with a seasonal pattern but no cold spell.
There are 60 parking spaces, so from 2027 Dutch law asks for at least 6 charge points, or ducting for half of the spaces2. The business wants 11 kW charge points for its employees' cars. Each charge point gets one car on working days, which arrives between 7:00 and 9:00 and stays 8 to 9.5 hours. A car needs 6 to 24 kWh, which matches a commute of about 30 to 125 km there and back3. On average a charge point stays empty on one working day in seven. Every week has the same pattern, holidays included. 95% of what the charge point delivers ends up in the car's battery.
What the factor says. The headroom above the highest peak is 160 − 132 = 28 kW. An 11 kW charge point counts as 11 kW times the factor.
A factor of 1 fits 2 charge points, the average factor 14
11 kW charge points in the 28 kW above the highest quarter hour, per simultaneity factor
| Factor | Charge point counts as | Charge points in 28 kW |
|---|---|---|
| 1 (NEN 1010) | 11 kW | 2 |
| 0.8 (busiest quarter hour) | 8.8 kW | 3 |
| 0.17 (average) | 1.9 kW | 14 |
So the same connection gives 2, 3 or 14 charge points, depending on which moment the factor describes.
Without smart charging, per quarter hour. Every car charges at 11 kW from arrival until it has its kWh. Add that to the business's consumption quarter hour by quarter hour, and you see on how many days consumption goes above the contracted transport capacity. In a congested grid area that is not allowed, not even for a few quarter hours a year (see sizing a battery for a business).
With 5 charge points, consumption already goes above 160 kW on 4 days
Working days in 2025 with at least one quarter hour above the transport capacity, without smart charging
| Charge points | Days above 160 kW | Highest quarter hour |
|---|---|---|
| 1 | 0 | 135 kW |
| 2 | 0 | 146 kW |
| 3 | 0 | 146 kW |
| 4 | 0 | 157 kW |
| 5 | 4 | 163 kW |
| 6 | 21 | 174 kW |
| 7 | 21 | 174 kW |
| 8 | 69 | 185 kW |
| 9 | 169 | 196 kW |
| 10 | 205 | 196 kW |
| 11 | 226 | 196 kW |
| 12 | 261 | 207 kW |
Without smart charging, 4 fit, fewer than the 6 the law asks for from 2027 if the business does not choose ducting. That is more than a factor of 1 or 0.8 says, because 79% of the cars are full by 10:00, before the business reaches its daily peak, usually between 10:00 and 12:00. And it is far fewer than the average factor says, because the cars all arrive in the same two hours. With ten charge points, seven cars charge at once at 9:00 on Monday 13 January, while the business itself is already at 119 kW.
Ten charge points without smart charging: 36 kW over the limit at 9:00
Consumption with charging per quarter hour on 13 January between 6:00 and 20:00. From 7:00 it rises quickly, from 8:30 to 9:45 it is above the transport capacity of 160 kW, with a peak of 196 kW at 9:00. After that it drops to the business's own consumption, around 120 kW.
You only know whether you picked the right factor once you have run the numbers per quarter hour. By then you no longer need the factor.
“Our clients want to grow. Extra warehouses, machines, production lines. But they can't get additional capacity from the grid operator. Wattix helps us show what's still possible within their existing connection.”
With smart charging. Smart charging divides the headroom under 160 kW among the cars plugged in, every quarter hour. Consumption then always stays within the transport capacity, and the question becomes whether every car is full when it leaves. For that, what counts is not the power of the charge point but the energy. A car that needs 14 kWh and stays 9 hours needs 1.6 kW on average, not 11 kW.
Up to 39 charge points, every car leaves with its kWh
Working days in 2025 on which a car leaves without all the kWh it needs, with smart charging
| Charge points | Days with a shortfall | Sessions with a shortfall | Shortfall per year |
|---|---|---|---|
| 35 | 0 | 0 | 0 kWh |
| 36 | 0 | 0 | 0 kWh |
| 37 | 0 | 0 | 0 kWh |
| 38 | 0 | 0 | 0 kWh |
| 39 | 0 | 0 | 0 kWh |
| 40 | 3 | 3 | 10 kWh |
| 41 | 7 | 10 | 64 kWh |
| 42 | 13 | 23 | 205 kWh |
| 43 | 22 | 45 | 484 kWh |
| 44 | 28 | 73 | 697 kWh |
| 45 | 34 | 106 | 1,112 kWh |
| 46 | 43 | 135 | 1,403 kWh |
| 47 | 61 | 196 | 2,150 kWh |
| 48 | 80 | 271 | 3,164 kWh |
| 49 | 91 | 324 | 3,898 kWh |
| 50 | 106 | 430 | 5,088 kWh |
With smart charging, 39 fit. That is 8,664 charging sessions in 2025, and every car gets the energy it came for on every working day. On 13 January consumption sits at 160 kW for ten hours to do so, and not one quarter hour above it.
39 charge points with smart charging: ten hours at the limit, not one quarter hour above it
Consumption with charging per quarter hour on 13 January between 6:00 and 20:00. From 7:30 it is at the transport capacity of 160 kW and stays there until 17:30. After that it drops to the business's own consumption, around 50 kW.
With 40 charge points, three cars leave without all the kWh they need on three days in January and December, 10 kWh short in all. With 43 charge points the shortfall over the whole year is 484 kWh, 0.4% of what the cars need. But that shortfall falls on 45 sessions spread over 22 days, and mostly in winter, when the heat pump uses part of the headroom.
The shortfall falls mostly in January, February and December
Energy cars are missing when they leave, per month, with 43 charge points and smart charging
| January | 200 kWh |
|---|---|
| February | 122 kWh |
| March | 2 kWh |
| April | 30 kWh |
| May | 0 kWh |
| June | 11 kWh |
| July | 23 kWh |
| August | 0 kWh |
| September | 0 kWh |
| October | 0 kWh |
| November | 0 kWh |
| December | 97 kWh |
Three things decide how much you can rely on that 39.
- The charging sessions. They are the most uncertain part of the calculation. If every car needs a quarter more energy, 29 fit instead of 39. And the example repeats the same pattern every week, while real occupancy varies more.
- The smart charging. The worked example plans charging with each car's departure time and kWh, and with a forecast of the building's consumption. Load balancing that always splits the power equally between the connected cars leaves more cars short on tight days, and then fewer charge points fit.
- The margin. The example calculates right up to 160 kW, with the heating of an ordinary year. If you want to stay a few kW under the transport capacity, or absorb a cold week, fewer charge points fit.
“You always have to make assumptions. But a platform like Wattix gives you the freedom to present results to your client in your own way, with the confidence that the underlying calculation model provides the same solid foundation every time.”
How to calculate it per quarter hour
- Take a year of quarter-hour data from the connection. A large connection is metered per quarter hour, and that is what the grid operator checks the transport capacity against. A whole year is needed because the tightest days often fall in winter. On a smaller connection, up to and including 3x80A, the main fuse is the limit, and it responds to every moment, not to the quarter-hour average.
- Write down the charging sessions. Per charge point: when the car arrives, when it leaves and how many kWh it needs. If you only know the commuting distance, use about 19 kWh per 100 km3. Also run a variant with more energy per car, because this is where most of the uncertainty is.
- Calculate without smart charging. Let every car charge at full power from arrival and add that to consumption quarter hour by quarter hour. If no quarter hour goes above the transport capacity, it fits without smart charging too. You then size the installation to NEN 1010 with a factor of 1.
- Calculate with smart charging. Divide the headroom under the transport capacity among the cars that are plugged in, quarter hour by quarter hour, giving priority to the car with the least time to spare, and check per session how many kWh the car has received when it leaves. Include the charging efficiency, 95% in this example.
- Add charge points until a session falls short. The last number without a shortfall is the answer with smart charging. Then you decide whether a few tight days are acceptable, or whether solar panels or a battery add headroom.
What Wattix does here
In Wattix you enter, per charge point, the power and the weekly charging sessions: when the car arrives, when it leaves and how many kWh it needs. Wattix plans charging per quarter hour within the contracted transport capacity, alongside the consumption in the connection's quarter-hour data, and shows per session how much energy the car gets and where the shortfall is. The worked example was calculated with the same engine. How it works is covered in smart charging in Wattix.
From there you run variants: more or fewer charge points, with or without a battery, or charging on solar power. See charging infrastructure within the grid connection. Where the uncertainty in a calculation like this lies, and how accurate it is, is covered in what an energy simulation is.
Frequently asked questions about chargers on a grid connection
What does NEN 1010 say about the simultaneity factor for charge points?
Clause 722.311 of the Dutch installation standard, which follows IEC 60364-7-722, prescribes a factor of 1 for the installation: all charge points can be used at the same time, so you size the circuits to the charge points as if they are. That does not apply when the load is controlled, in the charging station or upstream of it. Whether charging fits within the contracted transport capacity is a different question. You check that per quarter hour.
How many charge points does a business in the Netherlands need from 2027?
In the Netherlands, an existing non-residential building with more than 20 parking spaces needs at least 1 charge point per 10 parking spaces from 1 January 2027, or ducting for half of the spaces. Every charge point must be suitable for smart charging. How many charge points fit on the connection is a different question. In the worked example the rule asks for 6 charge points if the business does not choose ducting, while 4 fit without smart charging.
How many kWh does an employee's car charge per day?
As much as the commute takes, which is usually not much. At 19 kWh per 100 km, a 60 km round trip takes about 11 kWh. In the worked example the cars need 6 to 24 kWh, 14 kWh on average. Over a 9-hour working day that is 1.6 kW per car on average, far below the 11 kW of the charge point.
Does the connection need upgrading for more chargers?
Not always. In the worked example, the same 160 kW fits 4 charge points without smart charging and 39 with it. An upgrade only becomes worth looking at when cars still leave without the kWh they need, even with smart charging. Then first work out how much headroom solar panels or a battery would add.
Does a simultaneity factor work for vans that charge at night?
That is where it is furthest off. At night a business uses little and the headroom under the transport capacity is large: in the worked example never less than 114 kW between 22:00 and 5:00 on working days, against 28 kW in the tightest quarter hour during the day. The headroom above the year's highest peak does not show that night-time headroom.
What if more employees switch to electric cars?
Run the numbers again with the extra charging sessions. The answer depends more on the sessions than on the power of the charge points. In the worked example 39 charge points fit with smart charging, but if every car needs a quarter more energy, it is 29.
What kind of smart charging gets you the most charge points?
A system that knows, per car, how many kWh it still needs and when it leaves, and gives priority to the car with the least time to spare. A charge point usually does not know how much a car needs, so that has to come from the driver or an app. The worked example assumes that kind of planning, and a forecast of the building's consumption. Load balancing that always splits the power equally between the connected cars leaves more cars short on tight days, and then fewer charge points fit.
Related pages
- Smart charging within the grid connectionSimulate load balancing and smart charging per quarter hour and see how much energy each car gets per session.
- EV charging infrastructureCalculate EV charging per quarter hour within the connection, and see what smart charging or storage unlocks.
- Grid congestionFind the peak moments and show what is still possible without a grid upgrade.
The grid is full.
Show what still fits.
In a demo you see how to get from metering data to a recommendation you can back up. Bring your own data and we look at your case right away.
Sources
-
NEN 1010 clause 722.311 (NEN 1010 is the Dutch implementation of IEC 60364), quoted by Hensel Nederland in the ENYCHARGE product information (in Dutch, 2023): because all connection points of the installation can be used at the same time, "moet de gelijktijdigheidsfactor voor alle betrokken circuits als één worden aangenomen", the simultaneity factor for all circuits involved must be taken as one, unless load control is integrated in the supply for the electric vehicle, at an upstream point or in a combination of both. ↩
-
The Dutch Besluit bouwwerken leefomgeving, article 3.87b (in Dutch), as it applies from 1 January 2027: a building with more than 20 parking spaces has "a. ten minste één laadpunt voor elke tien parkeervakken; of b. leidingdoorvoeren voor laadpunten voor elektrische voertuigen voor ten minste de helft van het aantal parkeervakken", at least one charge point for every ten parking spaces, or ducting for at least half of them, and "Een laadpunt is geschikt voor slim laden", a charge point must be suitable for smart charging. In English, see Charging stations at commercial buildings on business.gov.nl. ↩
-
The average real-world consumption of electric cars in the EV Database, consulted on 22 October 2026: 191 Wh per km. ↩ ↩2